
Add to Cart
RYDBATT SSE-111(36V) Lithium Battery Pack Redar Li-18650-10S4P-36V 10.4AhFor Electric Bicycle Battery
Maintenance
Attaches to standard water bottle cage Storage and Maintenance When the battery pack to be long-term stored, charge the battery pack to about 50% capacity( after discharging completely, charge for 2 - 3h at 2A),store in dry and ventilated place, charge 1 to 2 hour for every 3 months. The battery pack and charger should be stored in clean,dry and ventilated place, avoid contacting with corrosive materials and be away from fire and heat. The battery pack should be stored in 40%-60% charged capacity. If battery pack is not used for a long period, it should be replenish charging one time for 1 to 2h for every three month. In the maintenance process, please do not disassemble the battery pack, forbid to remove any cell in the battery pack.
1 Product Configuration
No. | Item | Criteria | Remark |
1 | Lithium-ion Battery Cell | Li-18650 |
|
2 | PCM | PCM |
|
3 | Connector | / |
|
2 Product Dimension and standard
Specification | 36V 7Ah-13.6Ah |
Inner size | / |
Cells | 40PCS 18650 or soft-pack battery |
Cell Franme | / |
Electric Qty Display | 5LED |
Onoff Button | / |
Charge Connector | DC2.1 |
Fuse Holder | 15a |
Discharge Connector | 5PIN |
Lock | Mechanical lock |
Shell material | PC+ABS |
Name | Maximum Cells | Connection Type |
| Capacity |
|
SSE-111 | 40 | 10s4p | 8.8AH / 2200mAh | 10.4Ah / 2600mAh | 13.6Ah / 3400mAh |
3 Product Specification
4 PCM
Item | Content | Criterion |
Over charge Protection | Over charge detection voltage | 4.250±0.050V |
Detection delay time | 1.0±0.3S | |
Over charge release voltage | 4.150±0.050V | |
Over discharge protection | Over discharge detection voltage | 2.700±0.080V |
Detection delay time | 1.0±0.3S | |
Over discharge release voltage | 3.000±0.100V | |
Rated operational current | ≤20A | |
Over current protection | Primary over current detection current | 50±5A |
Primary detection delay time | 800mS-1200mS | |
Secondary over current detection curren | 100±10A | |
Secondary detection delay time | 50mS-200mS | |
Short protection | Detection condition | >200A, 200uS-300uS |
Protection | yes Exist | |
Protective release condition | Disconnect short circuit | |
Charging management | Charging overvoltage protection voltage | 43.5±0.4V |
Rated charging current | 3A | |
Software overcharges | 4±0.2A | |
Detection delay time | 300mS-600mS | |
Temperature protection | Charging high temperature protection temperature | 50±4℃ |
Charging protection recovery temperature | 47±4℃ | |
Discharge high temperature protection temperature | 70±4℃ | |
Discharge protection recovery temperature | 55±4℃ | |
Low temperature protect temperature of charging | 0±4℃ | |
Low temperature recovery temperature of charging | 5±4℃ | |
Interior resistance | Main loop electrify resistance | ≤60mΩ |
The static current | Since the power consumption | ≤60.0uA |
NTC | YES Exist | 10K±1% B3435±1% |
Delivery Time:
- Material Preparation Time: 7-15 days (or inventory)
- Production & Assembly Time 3-10 days
- Testing & Packaging Time: 2-10 days
- Total Delivery Time: 30-45days
- The faster delivery could be negotiable.
Factory Photo:
Contact with our sales team for your OEM and ODM order.
OEM/ODM Service:
If you want to display your own brand logo in products, bags, labels or anywhere. Or you need to develop battery packs according to your product orientation. Our OEM and ODM services are ready to do it.
Packing:
According to Stardard Export Packing.
Carton box, wooden box, wooden pallet
Ryder Electronics established in Shenzhen on July 18, 2005, mainly in the business of battery packs. In 2009 the company passed ISO9001 and improved the product quality standard to fulfill the high-end requirements from our customers.
In 2012, Ryder Electronics moved to a new facility and expend the production capacity, the Productivity improved nearly 10 times than before.
In 2013, Ryder Electronics imported ERP (SAP) system to supervise order execution process.
In 2017, Ryder Electronics expanded the SMT, imported high-speed patch machine from Germany.
Until now the factory grows into a modern enterprise which integrated injection molding, PCB designing, SMT and battery pack assembling services.
In 2018 the company passed ISO14001certification, introduced automated battery production line to further improve the production quality and capacity.